XALANT

Where grid and fiber end, agents begin.

Edge · Power · Communications — three companies, one site, one machine.

Edge data centers, off-grid clean power and satellite connectivity designed to be delivered as one platform, enabling the new frontier.

The transition to an AI-driven economy cannot run on legacy grids and centralized fiber.

01 · SITE

Campus wide

You bring a use case. We bring the site, the power, the backhaul and the compute as one contract.

  1. The site boundary. Power, cooling and backhaul are all inside it by design.
  2. Cooling plant designed for direct-to-chip liquid as well as precision air.
  3. On-site fuel storage for the bridge phase, sized for autonomy between deliveries.
02 · POWER

Power district

Firm, off-grid power from day one, on a dated ladder to geothermal and to a fluoride-salt reactor.

  1. Phase-one battery storage, holding the site through generator transitions.
  2. An enhanced-geothermal wellhead. A project concept on a multi-year horizon, not a built asset.
  3. Fluoride-salt reactor geometry as final phase.
03 · COMMS

Communications district

Satellite first, fibre second — a site is designed to be connected before a trench is dug.

  1. Where the satellite path meets the terrestrial network, and where fibre lands in a later phase.
04 · EDGE

Edge district and studio

One factory-built hall, liquid-ready, with the studio block beside it for the people who keep it running.

  1. Uninterruptible supply and dual-feed distribution, designed to carry the hall through a transfer.
  2. The Remote Development Center studio block: engineers and support staff living on the campus.

Manifesto

A self-sustaining infrastructure ecosystem: compute, power and connectivity designed as one machine, off-grid, on one site.

Clean
Clean and renewable
Access
Close to where it is needed
Yield
Surplus put to work
Communities
Under-served locations first

The bottleneck

Three constraints meet in one place, and that place is the site.

  • Compute

    AI and Web3 workloads want dense compute close to where the data is made. At the centralized core it is slow to reach and expensive to hold.

  • Power

    Hyperscale sites face rising power costs and a dependency on ageing, congested grids — and an interconnection queue measured in years.

  • Connectivity

    Rural and under-served markets do not have the terrestrial fibre backhaul a modern data centre is normally designed around.

Core insight

The transition to an AI-driven economy cannot run on legacy grids and centralized fiber.

Three companies · Edge is the hub

One campus, three companies, four markets to start.

Edge is the hub. Power and Communications are lit from it, so a use case meets one contract rather than three procurements.

Highlight one of the three companies
Reference render of an edge data yard: a row of factory-built halls on a concrete pad, drawn with a gold wireframe overlay.

Reference render

Plate 03-A · Edge data yardAI render

High-density modular compute, built to sit at the edge.

Edge in a Box, Edge Campus and the Remote Development Center — three sizes of the same factory-built hall, sited next to the demand and the power.

Request a site assessment
Reference render of a power skid: bridge generation sets and fuel storage beside the pad, drawn with a gold wireframe overlay.

Reference render

Plate 03-B · Power skidAI render

A phased, off-grid energy stack.

LPG and hydrogen bridge generation now, enhanced geothermal next, and a fluoride-salt reactor when its cost model and its licensing both stand up.

Model your power stack
Reference render of a gateway pad: a Ka-band antenna on its mount beside the meet-me hut, drawn with a gold wireframe overlay.

Reference render

Plate 03-C · Gateway padAI render

Satellite first, fibre second.

Every site is designed to be connected before a trench is dug: a Ka-band gateway on the pad, then lit terrestrial backhaul as a second phase.

Check coverage

How it works · The integration engine

A flywheel, not a stack: power, compute and connectivity compound at the edge.

  1. Generate

    Power is made on the site itself — bridge generation first, enhanced geothermal and a fluoride-salt reactor on the ladder behind it.

  2. Process

    That power is designed to feed edge data centers on the same pad, running high-density AI and Web3 workloads next to the demand.

  3. Connect

    Ground gateways carry the processed result back to the wider network — satellite first, so a site is connected before a trench is dug.

  4. Yield

    Surplus baseload power and spare gateway capacity are planned to be offered to the community around the site, any excess sold back to a grid.

The integration engineOne machine

Cloud vs autonomous edge

Our competitive advantage.

Centralized hyperscale cloud compared with the Xalant autonomous edge model
AxisCentralized hyperscale cloudXalant autonomous edge
Deployment speedYears — grid and fibre permitting before a rack is rackedMonths, not years — modular and off-grid
Grid dependencyReliant on ageing, congested gridsNone — on-site generation: bridge power today, geothermal then SMR
Network backhaulConstrained by hardline fibre routesLEO satellite backhaul — US markets at launch
Latency, ruralHigh — the data leaves the region to be processedProcessed on site — designed to avoid the remote network hop
Environmental impactHigh carbon and added grid strainNet-zero pathway with surplus yielded locally — design intent

Locations

Our development plans.

4 markets in the initial pipeline · target geographies across 6 regions. The pipeline markets carry a status and a market demand.

Two tiers: the named US markets in the initial pipeline, drawn as lit nodes, and the target geographies drawn as unfilled outlines carrying no site, agreement or date.United KingdomNorwayNetherlandsUnited Arab EmiratesSaudi ArabiaIsraelJapanSouth KoreaSingaporeAustraliaIndiaAfrica

Initial pipeline — 4 US markets, with the site data below.

Target geographies

Markets in the initial pipeline

Target geographies

Target geographies

United States

United Kingdom

Europe

Middle East

Far East

India

Africa

See every market at state level

Ecosystem

Our ecosystem

Power, compute and connectivity, drawn around one edge platform.

Line drawing of the Xalant campus: the hall row, the substation and the gateway dish, derived from a reference render.

Reference render

Plate 09 · The campus, drawnAI render — reference only

Talk to Xalant

Bring a use case. Xalant is designed to bring the site, the power, the backhaul and the compute as one contract.

Site and energy partners, enterprise and AI workloads, local providers and communities — in the four pipeline markets, or in a geography that is being targeted next.